ARK-E 4014 Industrial Wood Construction
Assignment 3: Building Systems
POST-BEAM + SLAB
“xxxxxxxx”
MARIIA ILINA, FRASER PLAXTON, YAQI LIAO, ENRICO BERTA
ARK-E 4014 Industrial Wood Construction
Maria, Fraser,Yaqi, Enrico
Post-Beam+Slab
01. Elementation
Concept diagram
ARK-E 4014 Industrial Wood Construction
Maria, Fraser,Yaqi, Enrico
Post-Beam+Slab
01. Elementation
Concept diagram
TypeA: Studio TypeB: 2 Bedroom+1WC TypeC: 2 Bedroom+1WC TypeC: 3 Bedroom+2 WC
ARK-E 4014 Industrial Wood Construction
Maria, Fraser,Yaqi, Enrico
Post-Beam+Slab
Ground Floor
ARK-E 4014 Industrial Wood Construction
Maria, Fraser,Yaqi, Enrico
Post-Beam+Slab
Level 1 & Level 2
ARK-E 4014 Industrial Wood Construction
Maria, Fraser,Yaqi, Enrico
Post-Beam+Slab
Level 3 & Level 4
ARK-E 4014 Industrial Wood Construction
Maria, Fraser,Yaqi, Enrico
Post-Beam+Slab
02. Durability and disassembly strategy
Usage Scenario
TypeC: 2 Bedroom+2WC
Increase
the social function of
the space
building conversion
1 Bedroom+1WC Office Building
+ Large Living room
ARK-E 4014 Industrial Wood Construction
Maria, Fraser,Yaqi, Enrico
Post-Beam+Slab
03. Transport and Assembly
Components
Glulam beam
100*350*3660
22 elements
approx. 3m3
Glulam beam
200*350*4600(vary)
65 elements
approx 21m3
Kerto ripa slab
328*2445(vary)*3660(vary)
85 elements
approx 250m3
Glulam post
200*300(200)*3100
(4500)
142 elements
approx. 26m3
ARK-E 4014 Industrial Wood Construction
Maria, Fraser,Yaqi, Enrico
Post-Beam+Slab
03. Transport and Assembly
Kerto-Ripa slab/panel Layouts
ARK-E 4014 Industrial Wood Construction
Maria, Fraser,Yaqi, Enrico
Post-Beam+Slab
03. Transport and Assembly
Construction Process
01 Concrete, Glulam Post+ GlulamBeam, CLT Shaft
200*300mm Glulam Post
200*350mm GlulamBeam
CLT Shaft
ARK-E 4014 Industrial Wood Construction
Maria, Fraser,Yaqi, Enrico
Post-Beam+Slab
200*300mm Glulam Post
Kerto Ripa Slab
200*350mm GlulamBeam
CLT Shaft
03. Transport and Assembly
Construction Process
02 Glulam Post+ GlulamBeam, Kerto Ripa Slab
ARK-E 4014 Industrial Wood Construction
Maria, Fraser,Yaqi, Enrico
Post-Beam+Slab
200*300mm Glulam Post
Kerto Ripa Slab
200*350mm GlulamBeam
CLT Shaft
03. Transport and Assembly
Construction Process
03 Double-height spaces
ARK-E 4014 Industrial Wood Construction
Maria, Fraser,Yaqi, Enrico
Post-Beam+Slab
03. Transport and Assembly
Construction Process
03 CLT Stairs
200*300mm Glulam Post
Kerto Ripa Slab
200*350mm GlulamBeam
CLT Shaft
ARK-E 4014 Industrial Wood Construction
Maria, Fraser,Yaqi, Enrico
Post-Beam+Slab
03. Transport and Assembly
Construction Process
03 Exterior wall cladding
200*300mm Glulam Post
Kerto Ripa Slab
200*350mm GlulamBeam
CLT Shaft
ARK-E 4014 Industrial Wood Construction
Maria, Fraser,Yaqi, Enrico
Post-Beam+Slab
03. Manufacturing
Acoustic + Mechanical Consideration
ARK-E 4014 Industrial Wood Construction
Maria, Fraser,Yaqi, Enrico
Post-Beam+Slab
03. Manufacturing
Section A
B
ARK-E 4014 Industrial Wood Construction
Maria, Fraser,Yaqi, Enrico
Post-Beam+Slab
04. Manufacturing
Typical Joint: Post and beam
ARK-E 4014 Industrial Wood Construction
Maria, Fraser,Yaqi, Enrico
Post-Beam+Slab
04. Manufacturing
Typical Joint:Outside
Detail 1
Detail 2
Detail 3
Gluelam Post 300 mm
Gluelam Beam 350 mm
Fermacell Plaster Slabs
Flooring
Sound Insulation 65 mm
Insulation 100 mm
LVL 65 mm
Concrete 275 mm
LVL 25 mm
Facade Pannel
Horizontal Laths + Air Cavity 25 mm
Windproof Layer + Insulation 25 mm
Mineral Wool Insulation 200 mm
Water Vapour Membrane
Cross Battens 48 x 48 mm + Mineral Wool
Vertical Laths + Air Cavity 25 mm
VECTORWORKS EDUCATIONAL VERSION
VECTORWORKS EDUCATIONAL VERSION
ARK-E 4014 Industrial Wood Construction
Maria, Fraser,Yaqi, Enrico
Post-Beam+Slab
04. Manufacturing
Typical Joint: Roof/ Wall to roof
Gluelam Post 300 mm
Gluelam Beam 350 mm
Fermacell Plaster Slabs
Flooring
Sound Insulation 65 mm
Insulation 100 mm
LVL 65 mm
Concrete 275 mm
LVL 25 mm
Facade Pannel
Horizontal Laths + Air Cavity 25 mm
Windproof Layer + Insulation 25 mm
Mineral Wool Insulation 200 mm
Water Vapour Membrane
Cross Battens 48 x 48 mm + Mineral Wool
Vertical Laths + Air Cavity 25 mm
VECTORWORKS EDUCATIONAL VERSION
VECTORWORKS EDUCATIONAL VERSION
ARK-E 4014 Industrial Wood Construction
Maria, Fraser,Yaqi, Enrico
Post-Beam+Slab
04. Manufacturing
Typical Joint: Internal wall to floor
Gluelam Post 300 mm
Gluelam Beam 350 mm
Fermacell Plaster Slabs
Flooring
Sound Insulation 65 mm
Insulation 100 mm
LVL 65 mm
Concrete 275 mm
LVL 25 mm
Facade Pannel
Horizontal Laths + Air Cavity 25 mm
Windproof Layer + Insulation 25 mm
Mineral Wool Insulation 200 mm
Water Vapour Membrane
Cross Battens 48 x 48 mm + Mineral Wool
Vertical Laths + Air Cavity 25 mm
VECTORWORKS EDUCATIONAL VERSION
VECTORWORKS EDUCATIONAL VERSION
ARK-E 4014 Industrial Wood Construction
Maria, Fraser,Yaqi, Enrico
Post-Beam+Slab
04. Manufacturing
Typical Joint: Wall to concrete floor
VECTORWORKS EDUCATIONAL VERSION
VECTORWORKS EDUCATIONAL VERSION
VECTORWORKS EDUCATIONAL VERSION
ARK-E 4014 Industrial Wood Construction
Maria, Fraser,Yaqi, Enrico
Post-Beam+Slab
04. Manufacturing
Elevation
ARK-E 4014 Industrial Wood Construction
Maria, Fraser,Yaqi, Enrico
Post-Beam+Slab
04. Manufacturing
U-value calculations
U = 1 / (Rinside + Routside + Rint-clad + Rins-1 + Rmembrane + Rins-2 + Rwind-ins-3 + Rfacade)
In W/m²K
R = d/k in
d = thickness in m
k = conductivity in W/mK
R = Resistance in m²K/W
Rinside = 1/25 = 0.04
Routside = 1/8 = 0.125
Rint-clad (0.018 m) = 0.018/0.15 = 0.12
Rins-1 (0.048 m) = 0.048/0.035 = 1.371
Rmembrane (0.005 m) = 0.005/0.17 = 0.029
Rins-2 (0.2 m) = 0.2 / 0.035 = 5.714
Rwind-ins-3 (0.025) = 0.025 / 0.035 = 0.714
RTOT = 8.113 m²K/W
U = 0.123 W/m²K
ARK-E 4014 Industrial Wood Construction
Maria, Fraser,Yaqi, Enrico
Post-Beam+Slab
05. Conclusions and recommendations
Structure Axo
01- Concrete 02- Glulam Structure 03- CLT 04- LVL 05-Exterior Envelope
ARK-E 4014 Industrial Wood Construction
Maria, Fraser,Yaqi, Enrico
Post-Beam+Slab
05. Conclusions and recommendations
Weight and volume calculations
Category Volume
(m³)
Weight
(kg)
%Density
(Kg/m³)
Notes
1Glulam -- -
1.1 Posts 18.24 88557722..882.3% 470 Moisture content 12%
1.2 Beams 28.72 1133449988..443.7% 470 Moisture content 12%
2Kerto LVL (ribs + plates) ---- -
2.1 Ribs 28.54 1133441133..883.7% 470 Moisture content 12%
2.2 Plates 45.94 2211559911..885.9% 470 Moisture content 12%
3
CLT (shear, shaft walls + floor decks, stairs @
stair shaft) 63.95 3
3
0
0
0
0
5
5
6
6
.
.
5
5
8.2% 470 Moisture content 12%
4Floor Assembly (acoustic layers) --
4.1 Wood Flooring 7.54 5
5
3
3
8
8
5
5
.
.
8
8
1.5% 714.3
*From OneClick LCA (parquet
flooring
4.2 Gypsum Layers 14.01 99338866..772.6% 670
4.3 Acoustic Insulation 26.95 11664444..000.4% 61 Mineral wool insulation
5
Concrete (foundation + floor topping @ stair
shaft)
93.9 2
2
1
1
3
3
6
6
2
2
2
2
.
.
5
5
58.4% 2275 -
6Reinforcement for concrete (rebar) 1.90 1144991155..004.1% 7850 2% of total concrete volume
7Exterior Envelope ----- -
7.1 Timber Cladding 13.23 66227711..001.7% 474 Plain softwood
7.2 Battens 15.52 77335566..552.0% 474 Plain softwood
7.3 Wind Board (wood fibre) 11.49 22887722..550.8% 250 Hunton wood fibre board
7.4 LVL framing 15.3 77119911..002.0% 470
7.5 Insulation (cellulose) 77.92 22888833..000.8% 37
7.6 Interior panelling (gypsum) 10.26 66887744..221.9% 670 -
7.7 Interior panelling (plywood) 10.26 44992244..881.3% 480 -
Total 448833..6677336655553355..5511
BUILDING MATERIALS
*Calculations dont include firewalls, elevator shaft
*Calculations don’t include firewalls, elevator shaft, windows + doors
ARK-E 4014 Industrial Wood Construction
Maria, Fraser,Yaqi, Enrico
Post-Beam+Slab
05. Conclusions and recommendations
Strengths and Weaknesses
Strength Weakness
01 01
02 02
03
03
Flexible plans Number of elements are needed
Opportunity of building conversion Deep floor assembling
Acoustic and fire safety issuesExposed timber elements
Only the post and shafts are load bearing
system. All the inner wall is not load
bearing, so the layout of the interior is
easy to change
Construction process: temporary
lateral bracing, number of elements
that need a crane + connections
The post-beam+ slab structure is flexible
to change to different building types. eg.
office buildings
Drop slabs and beam add complexity
to the system (HVAC, MEP, clear
height), compared to flat plate.
Acoustic and fire safety issues on the
joint of post and beam
Ability to have exposed timber elements
within residential units in a post and beam
system.
ARK-E 4014 Industrial Wood Construction
Maria, Fraser,Yaqi, Enrico
Post-Beam+Slab
07.Reference
https://miesarch.com/work/1437
https://www.metsagroup.com/fi/metsawood/tuotteet-ja-palvelut/tuotteet/kerto-lvl/t-stud/
https://www.metsagroup.com/fi/metsawood/tuotteet-ja-palvelut/tuotteet/kerto-lvl/s-beam/
https://bk-wood.nl/kerto-ripa/
https://pdf.archiexpo.com/pdf/metsaewood/kerto-ripa/60821-136927.html